FUJIAN UNITED TRAFFIC FACILITIES CO.,LTD

ABOUT US

产品中心

MAIN PRODUCTS

 

Product Details

Epoxy Adhesive for Road Stud

Category : Glue of road stud

  The epoxy adhesive for road stud is solvent-free and environment-friendly composed of A and B components,which is specially innovated for the complicated and poor outdoor construction conditions of the installation of road studs. It is easily handling and processing by mixing with a certain ratio of two different components. The rapid drying performance and smooth penetrability can greatly enhance labor working efficiency as well as labor cost. The adhesive and fast curing and film layers are firm and tenacious after drying with an excellent performance of shrink-resistance and without any irritant odor.

 

1.Main Characteristics and Advantages 

( superior bonding strength, easily processing, powerful seismic-resistant effect and impact resistant, anti-slip)

1). A and B components easily mixing and stirring, large scale penertration and coating. 

2)Superior bonding strength with various types of plastic, metal, glass, ceramic road studs, etc with an excellent performance of anti-shrinking.  

3)Fast curing at normal temperature. 

4)Solvent-free, no irritant odor, and environment-friendly.

5)Paste and no leak and flow, adoptable with complicated construction conditions.  

 

 

 

2.Product Parameters 

Product Parameters

Items

Road Stud Glue

Components

A group

B group

Specifications (20kgs)

10 kg

10 kg

Colour/ Shape

White, Paste

Grey , Paste

Mix Ratio

A:B=100:100(weight ratio)

Construction period 25℃

20-30min

Initial Curing Time25℃

1 hour

Completely Cured Time25℃

24 hours

Maxim Installation Quantity

of Road Studs

20/kg, 400/group

Shelf Life( at below 25℃)

12 months

 

3.Technical Parameters 

Items

Test Value

Shearing Strength/Mpa

10-11

Hardness (Shore D)

70-80

Heat Deflection Temperature/℃

60-70

Water Absorption /%

(100℃/24hours)

<0.30

 

4.Descriptions of Components 

A group

B group

T101-A

Percentage of composition (%)

T101-B

Percentage of composition (%)

Modified

Epoxy Resin

40-50

Modified Aliphatic Amine

40-50

Filler

40-50

Filler

40-50

Catalyzer

5-10

Additive

5-10

 

5.Installation Guideline

1). Inspection of Construction Conditions↓

Road surface: dry, clean, smooth and firm

Environment: No water on the road within 24 hours before and after construction.

 

2). Installation Methods and Guideline↓

①. Mix and stir A/B group in a uniform status at a weight ratio of 1:1. Total mix quantity depends on numbers of labors. Use it up within 30 minutes after mixing. 

②.Cover the bottom of road stud uniformly with glue ensuring enough glue on four corners of the stud.

③.Press and install the stud at specific place until the glue overflows. 

 

6.Notes and Pre-Cautions

The above information does not include product safety information.Before use, please read the product information, product safety information and packaging label for safe use.

 

 

Contact us

 

Contact

Online Message

Username used for comment:
客户留言
Description:
验证码

Contact us

 

 

FUJIAN UNITED TRAFFIC FACILITIES CO.,LTD.

Add:B9-2305 Wanda Plaza Cangshan District,Fuzhou,FuJian China

Tel:+860591-88231421    +860591-88231428

Contacts:Bin +8615005994748

Email:fjunited@qq.com  bin@fjunited.com

BY:300.cn    闽ICP备16001056号

Copyright All Rights ©2019 FUJIAN UNITED TRAFFIC FACILITIES CO.,LTD.    BY:www.300.cn    闽ICP备16001056号