The epoxy adhesive for road stud is solvent-free and environment-friendly composed of A and B components,which is specially innovated for the complicated and poor outdoor construction conditions of the installation of road studs. It is easily handling and processing by mixing with a certain ratio of two different components. The rapid drying performance and smooth penetrability can greatly enhance labor working efficiency as well as labor cost. The adhesive and fast curing and film layers are firm and tenacious after drying with an excellent performance of shrink-resistance and without any irritant odor.
1.Main Characteristics and Advantages
( superior bonding strength, easily processing, powerful seismic-resistant effect and impact resistant, anti-slip)
1). A and B components easily mixing and stirring, large scale penertration and coating.
2)Superior bonding strength with various types of plastic, metal, glass, ceramic road studs, etc with an excellent performance of anti-shrinking.
3)Fast curing at normal temperature.
4)Solvent-free, no irritant odor, and environment-friendly.
5)Paste and no leak and flow, adoptable with complicated construction conditions.
2.Product Parameters
Product Parameters |
||
Items |
Road Stud Glue |
|
Components |
A group |
B group |
Specifications (20kgs) |
10 kg |
10 kg |
Colour/ Shape |
White, Paste |
Grey , Paste |
Mix Ratio |
A:B=100:100(weight ratio) |
|
Construction period 25℃ |
20-30min |
|
Initial Curing Time25℃ |
1 hour |
|
Completely Cured Time25℃ |
24 hours |
|
Maxim Installation Quantity of Road Studs |
20/kg, 400/group |
|
Shelf Life( at below 25℃) |
12 months |
3.Technical Parameters
Items |
Test Value |
Shearing Strength/Mpa |
10-11 |
Hardness (Shore D) |
70-80 |
Heat Deflection Temperature/℃ |
60-70 |
Water Absorption /% (100℃/24hours) |
<0.30 |
4.Descriptions of Components
A group |
B group |
||
T101-A |
Percentage of composition (%) |
T101-B |
Percentage of composition (%) |
Modified Epoxy Resin |
40-50 |
Modified Aliphatic Amine |
40-50 |
Filler |
40-50 |
Filler |
40-50 |
Catalyzer |
5-10 |
Additive |
5-10 |
5.Installation Guideline
1). Inspection of Construction Conditions↓
Road surface: dry, clean, smooth and firm
Environment: No water on the road within 24 hours before and after construction.
2). Installation Methods and Guideline↓
①. Mix and stir A/B group in a uniform status at a weight ratio of 1:1. Total mix quantity depends on numbers of labors. Use it up within 30 minutes after mixing.
②.Cover the bottom of road stud uniformly with glue ensuring enough glue on four corners of the stud.
③.Press and install the stud at specific place until the glue overflows.
6.Notes and Pre-Cautions
The above information does not include product safety information.Before use, please read the product information, product safety information and packaging label for safe use.